CF1R

A residential Certificate of Compliance describing the proposed design and its applicable Energy Code compliance path. It is design documentation, not proof that equipment has been installed or field verified.

Read the CF1R guidance
CF2R

A residential Certificate of Installation used for applicable installed measures. The responsible installer documents the work; a design-phase report alone does not replace this handoff.

Read the CF2R guidance
CF3R

A residential Certificate of Verification for measures requiring independent verification. Required verification and its documentation are separate from our design-report preparation.

Read the CF3R guidance
NRCC

Nonresidential Certificates of Compliance document the proposed design for applicable commercial building systems. The project scope determines which certificates are needed, rather than one universal package for every tenant improvement.

Read the NRCC guidance
NRCI

Nonresidential Certificates of Installation record applicable installed measures. They are a construction-stage responsibility distinct from preparing design-phase NRCC documents.

Read the NRCI guidance
NRCA

Nonresidential Certificates of Acceptance document required acceptance testing for applicable systems. Acceptance testing is separate from our report-preparation service.

Read the NRCA guidance
ECC

Energy Code Compliance is the CEC program framing used for applicable verification under the 2025 Energy Code. Required field verification is separate from the design documents Title 24 Lab prepares.

Read the ECC guidance
HERS (legacy terminology)

Older-cycle documents may refer to the Home Energy Rating System program and HERS verification. Do not simply relabel an older report; confirm the applicable edition and verification program.

Read the HERS (legacy terminology) guidance
LSC — Long-term System Cost

A metric used in applicable 2025 Energy Code performance comparisons, not a prediction of a household’s utility bill. Older reports may use time-dependent valuation (TDV); those older metrics and thresholds should not be transplanted into a current report.

Read the LSC — Long-term System Cost guidance
Reach code

A local requirement that goes beyond statewide Energy Code provisions within its applicable scope. Confirm current approved provisions and application-date rules with the AHJ rather than assuming every city has the same extra requirements.

Read the Reach code guidance
Performance approach

An approved modeling approach comparing the proposed design with applicable compliance budgets while retaining mandatory requirements. It is not a blanket waiver of individual requirements or a permit-approval promise.

Read the Performance approach guidance
Prescriptive approach

A compliance path using the applicable prescribed measures for the project instead of relying on modeled trade-offs. Project type, edition and scope determine the measures and documentation.

Read the Prescriptive approach guidance
Conditioned floor area

Floor area associated with heated or cooled space, which may differ from gross area shown on a title block. Identify conditioned and unconditioned areas on the plans and have the modeler confirm the scope before a pricing tier is final.

Read the Conditioned floor area guidance
Person looking over a printed building plan at a construction site

Representative construction coordination, not our employee, project or an inspection.

Photograph: GN Group / Unsplash. Unsplash License.

Representative stock photography. Not our projects, staff or offices.

Sources and next steps

For document selection, use the forms guide. For scope boundaries, read Part 6 versus CALGreen. A plan-check comment needs its own scope review.

Understand report costs · Published pricing · How to order

Upload plans for a scoped quote