Skip to content

Title 24 Lab / Title 24 Reports for ADU Builders & Garage Conversion GCs

ADU builds and garage conversions: coordinate the energy scope before the next handoff.

For ADU builders, design-build teams and garage-conversion general contractors: assemble one coordinated plan set, identify the dwelling and system boundaries, and upload the inputs for a Title 24 Part 6 documentation quote. Title 24 Lab is a provisional brand, not a claim of licensing, local offices or permit authority.

Contemporary two-story home at dusk with dark timber cladding, lit floor-to-ceiling windows, a covered patio and a large eucalyptus tree on the lawn

Representative stock photography. Not our projects, staff or offices.

01

Name the scope before pricing the report

An ADU label does not describe the whole energy-compliance scope. A detached new dwelling, an attached addition and a conversion of previously unconditioned garage space can involve different starting conditions. Show what exists, what becomes conditioned and what changes in the main home. A garage converted to habitable accessory space is not automatically the same as a separate dwelling unit, and unconditioned storage is not automatically exempt from every altered-component requirement.

Use the shared garage decision matrix to frame the intake conversation, not to establish zoning eligibility or a permit exemption. The architect or responsible designer should identify intended use, dwelling separations and the permit scope; confirm classification and application-date requirements with the AHJ.

02

Send a coordinated builder intake packet

Provide legible existing and proposed floor plans, elevations and sections, with the conditioned-area boundaries and dwelling-unit count clearly marked. Include orientation, window and door schedules with supported U-factor/SHGC values, insulation and assembly details, and HVAC and domestic-hot-water intentions. Identify retained garage walls and slabs separately from new assemblies. Do not replace dimensions and sections with photographs alone; photos can support the drawings but cannot resolve every model input.

Send the project address, reviewing agency and recorded permit-application date if known. Add the current sheet index and revision dates, identify unresolved equipment choices, and nominate one person to collect designer answers. PDF is useful for the coordinated review set; DWG or ZIP support can be uploaded when helpful. Label unknowns rather than filling in assumed ratings.

03

Coordinate shared systems and main-house changes

Describe whether the project proposes a separate HVAC system, an extension to an existing system, or another arrangement for design-team review. Show which spaces each system serves and identify water-heating and ventilation scope. A shared utility meter does not establish that one compliance model or one equipment assumption fits every dwelling. If the main house also changes windows, insulation or equipment, mark those changes rather than treating them as invisible background.

For permit applications on or after January 1, 2026, current statewide guidance uses the 2025 California Energy Code; confirm the recorded date with the AHJ. Older-cycle documents may still use HERS wording. Current residential field-verification language is ECC, and required installer or verifier records remain separate from design-phase report preparation.

04

Use the residential menu, not an ADU-only price

The published residential square-footage bands and additional-dwelling-unit adder apply; there is no separate ADU, garage-conversion or remodel price menu. Tell us which conditioned area and units the requested documentation actually covers. Including a main home in the drawings is not, by itself, an instruction to quote a second report or charge an extra unit. Confirm the modeling and document boundary at intake rather than comparing prices for different scopes.

The shared pricing summary below carries the same owner-published tiers as the pricing page. Use the estimator for planning, then upload the coordinated package for confirmation. Submission is a scope-review request, not online payment or production acceptance. A larger resubmittal that needs the energy model rebuilt requires a custom quote, not the flat architectural-revision price.

05

Keep revisions and construction handoffs distinct

Keep the submitted report, reviewed drawings and complete correction letter together. Corrections caused by our modeling/report error are Free; architectural/design revisions are $75 flat; a full remodeled model or major resubmittal is Custom quote after intake. A comment letter can contain both a report issue and a design change, so preserve the comment numbers and mark the changed sheets instead of labeling the entire package one kind of revision.

Rush residential production is the published upgrade for next-business-day production after complete inputs, not an unconditional 24-hour promise. Scope review, unresolved drawings and AHJ review are separate. Design-phase CF1R documentation does not replace contractor installation certifications, required ECC field verification, nonresidential acceptance testing, registry/document-registration fees, CALGreen documentation or AHJ permit fees. We do not control reviewer staffing or approve permits.

Published schedule

Flat prices for report preparation

Residential

By conditioned floor area in the confirmed report scope.

Up to 2,000 sq ft
$149
2,001 to 4,000 sq ft
$199
4,001 to 6,000 sq ft
$279
Over 6,000 sq ft
$279 + $50per additional started 1,000 sq ft
Each additional dwelling unit
+$75beyond the first

Revisions

Plan-check correction caused by our modeling or report error
Free
Architectural or design revision after the report
$75 flat
Full remodel of the energy model or larger resubmittal
Custom quoteintake required

Rush

+$99 residential. Next-business-day production after complete inputs are received. Not a permit-approval or unconditional 24-hour promise.

Not included

  • ECC field verification (formerly called HERS testing in older documents)
  • Nonresidential acceptance testing
  • Registry or document registration fees
  • CALGreen documentation
  • Building department (AHJ) plan check and permit fees

No payment is taken online. Price and scope are confirmed with you before work begins. Full pricing page

Educational code context: California Energy Commission 2025 Energy Code resources. Confirm the applicable scope, recorded application date and requirements with the AHJ. This is not legal or engineering advice; CEC resources do not set our prices.

Common questions

Is there a special ADU report price?

No. Use the published residential conditioned-square-footage tiers and additional-unit adder. Intake confirms the area, units and document boundary; major model rebuilds require a custom quote.

Should I include the main-house drawings?

Include enough existing and proposed information to explain the project boundary and shared or changed systems. Mark main-house work explicitly; do not assume it is either excluded from or automatically included in the model.

Can a GC upload plans on the owner’s behalf?

A builder can typically coordinate the documentation request when authorized to share the plans. Identify the project contact and billing party; do not assume uploading establishes permit-applicant authority. Confirm authorization with the project team or AHJ when uncertain.

Does the report include ECC testing or CALGreen?

No. Our scoped deliverable is Part 6 design-phase documentation. ECC field verification, acceptance testing, registry fees, CALGreen documentation and AHJ fees are separate. Verify required handoffs with the responsible parties and AHJ.

Next step

Send the plan set. We will scope it.

Sign in to upload. No payment is taken online, and submitting is not order acceptance. Report preparation is not field verification or acceptance testing.