Title 24 Lab / Title 24 Reports for Contractors and GCs

Price the report. Know what stays in your bid.

The energy report is paperwork prepared from plans. Installation certificates, field verification and acceptance testing are separate responsibilities. Knowing where the line falls keeps your bid honest.

Aerial view of construction workers in hard hats and safety vests standing on a concrete deck beside rebar and conduit runs of a large building under construction

Representative stock photography. Not our projects, staff or offices.

Shared advisory project context

Read-only context from this link, not a verified project record or portal access. City, ZIP and climate zone are advisory; confirm the exact parcel, AHJ and application date. Revision scope is subject to review. The URL contains these values; share it only with the intended team.

  • Report type — advisory: residential
Upload plans with this advisory context
01

Where the report ends

We prepare compliance documentation for the permit application from the plan set. That work has a flat published price you can carry into a bid. What we do not provide is anything that happens on site: installing to the documented values, completing installation certificates, ECC field verification by a qualified rater, or nonresidential acceptance testing.

Projects with permit applications submitted on or after January 1, 2026 are generally reviewed under the 2025 California Energy Code. Field verification is now described as ECC verification; older documents may still call it HERS.

  • Report preparation: covered by our published price
  • Installation certificates: completed by the installer
  • ECC verification: a separate qualified rater
  • Acceptance testing and agency fees: separate
02

Intake example card: a residential remodel

Illustrative bid-stage intake, not a completed client project: a GC is pricing a kitchen and bathroom remodel that also changes windows and equipment. Send a scope summary separating cosmetic work from altered envelope, lighting, water heating and HVAC. A room name alone does not tell the modeler whether an altered-component certificate or a broader performance package fits. Do not assume every kitchen needs a whole-building model, or that calling work cosmetic removes energy-document obligations. Confirm the application date and required documentation with the AHJ.

Upload the current architectural plans, existing-versus-proposed floor plans, elevations for affected openings, sections and the window schedule. Mark each retained and replacement window, its dimensions and selected U-factor/SHGC information. Include equipment schedules or product specifications for changed HVAC and water heating, plus insulation and assembly notes where walls or roofs are opened. For lighting changes, include the relevant layout and controls information. A dated sheet index lets the consultant distinguish the intended permit set from an earlier pricing set.

If the contractor is taking over an existing report, include that report and the actual plan-check letter. Cloud changes and identify the responsible designer rather than uploading an unlabeled mixture of old and new sheets. State which substitutions are proposed, which are approved by the designer, and which remain undecided. The energy consultant prepares design compliance documentation; the project designers remain responsible for their drawings and the installer for construction records. Avoid buying a different system on the assumption that its nominal size alone matches the report.

Budget the report using the published residential square-footage bands and total dwelling-unit count, not a separate remodel menu. Clarify the area included in the requested documentation before pricing it into the bid. Our own modeling/report-error corrections are Free; post-report architectural/design revisions are $75 flat. A major redesign requiring a rebuilt model needs a custom quote after intake. Upload the packet to confirm scope and price before treating the estimate as an accepted order.

  • Scope and dated sheet index
  • Existing/proposed plans and changed-component schedules
  • Current report, comment letter and clearly marked revisions
03

Intake example card: an ADU or garage conversion

Illustrative intake: a builder is preparing a garage-conversion ADU bid while the owner is also considering changes to the main dwelling. Label the conversion boundary and distinguish existing unconditioned garage space from existing conditioned rooms, proposed living space and unrelated main-house work. A garage, detached ADU and attached addition are not interchangeable energy-model boundaries. State the proposed use and which drawings the AHJ will review together; do not infer occupancy or an exemption from the marketing name of the project.

Send dimensioned plans, elevations, sections, a north arrow and the proposed conditioned floor area. Show the existing slab, walls and roof, proposed insulation assemblies, new window/door schedules and any retained openings. Include the HVAC arrangement: dedicated equipment or a proposed extension of an existing system, with designer-supplied specifications and duct locations when relevant. Add water-heating location and selection, and solar/battery information only where it is actually part of the design. Flag unknown equipment instead of inventing performance values to complete the form.

Identify the total dwelling units in the report request and separate the ADU scope from any main-house revision. ADU reports use the same residential conditioned-area bands as other residential work, plus $75 for each additional dwelling unit beyond the first in the confirmed package. There is no special ADU or garage-conversion price menu. Main-house and ADU drawings do not automatically mean a particular unit surcharge applies: ask the consultant to confirm the documentation boundary and unit count before carrying it into a proposal.

Use the complete intake checklist and name a design contact for unresolved details. Optional residential rush is +$99 and means next-business-day production after complete inputs; commercial rush is +$149. Neither changes AHJ review time or guarantees permit approval. ECC field verification/testing, nonresidential acceptance testing, registry/document-registration fees, CALGreen documentation and AHJ plan-check/permit fees are separate from the energy report. Installation certificates belong to the responsible installers, with independent verification where required. This is educational coordination guidance, not legal advice or a local permit checklist.

  • Conversion boundary, conditioned area and total units
  • Existing envelope and proposed assemblies
  • HVAC, water-heating and fenestration selections
04

Read the documentation before you price equipment

The compliance documents describe the efficiencies, insulation values and verification items the design depends on. Reviewing them before final pricing helps avoid substituting equipment or assemblies that no longer match what was permitted. If a substitution is needed, it may require a documentation revision.

For corrections from a plan checker, send the letter. If the issue came from our own modeling or report error, the fix is free.

05

Fast when inputs are complete

Rush production is available for a published fee and means next-business-day production after complete inputs are received. It is not a permit approval timeline. The quickest path is a full plan set with equipment and assemblies shown.

Bid line copy pack

Proposal-ready lines from the published schedule

How to use these lines

  1. 1. Copy the published lines

    Choose the relevant residential, commercial, unit, rush, revision and exclusion lines from the published schedule below.

  2. 2. Paste into your proposal

    Keep the square-footage bands, scope qualifications and exclusions with the copied lines. These are published allowances, not a final project quote.

  3. 3. Upload plans to get the real quote

    Send project basics and plans through Get a Quote. We review the scope and confirm the tier and price before work starts.

Upload plans or send project basics

Title 24 Lab — published proposal lines

Residential Title 24 report — from $149 (Up to 2,000 sq ft). Title 24 Lab design-phase documentation by conditioned floor area: Up to 2,000 sq ft $149; 2,001 to 4,000 sq ft $199; 4,001 to 6,000 sq ft $279; Over 6,000 sq ft $279 + $50 per additional started 1,000 sq ft. Each additional dwelling unit beyond the first +$75.

Commercial / TI Title 24 documentation — from $399 (Up to 5,000 sq ft). Title 24 Lab design-phase documentation by floor area: Up to 5,000 sq ft $399; 5,001 to 15,000 sq ft $599; Over 15,000 sq ft Custom quote.

Additional residential dwelling unit beyond the first in the confirmed report scope: +$75. No separate ADU price menu.

Optional rush: +$99 residential / +$149 commercial for next-business-day production after complete inputs are received. Not a permit-approval guarantee.

Revisions: city plan-check correction caused by Title 24 Lab modeling or report error Free; architectural or design revision after the report $75 flat; full energy-model remodel or larger resubmittal by custom quote (intake required).

Excluded from Title 24 report line: ECC field verification (formerly called HERS testing in older documents); Nonresidential acceptance testing; Registry or document registration fees; CALGreen documentation; Building department (AHJ) plan check and permit fees.

Upload plans to start: https://title24lab.com/get-a-quote?persona=gc#plans

Plain text you can paste into a bid. Select the text in any box to copy it. Final price and scope are confirmed after plan review.

No payment is taken online. Report preparation is not ECC field verification or acceptance testing.

Commercial TI intake examples

Send the actual scope rather than assuming every tenant project needs the same package. These are intake examples, not AHJ submittal rules. Confirm the application date and required documents with the reviewing jurisdiction.

Lighting-only tenant improvement

  • Reflected ceiling plan with the work area identified
  • Fixture schedule with proposed lighting information
  • Controls narrative describing the proposed control scope
  • Tenant area and existing-versus-proposed lighting scope

Lighting TI: what to send

Educational intake checklist only, not an approval or compliance determination. The AHJ governs required documents and the applicable application date.

Optionally mark the items you already have. Selected items travel with the upload link as advisory context; you can change them on the quote form.

The RCP shows fixture locations. Include fixture types, wattage and quantities in the schedule, a controls narrative or controls plan, and a tenant floor plan with space uses and area.

Send what you have; missing items never block a quote request. We can ask for missing inputs before scope and price are confirmed. Documentation preparation is separate from field or acceptance testing.

Upload lighting TI plans

Commercial documentation follows the published square-footage bands, not a separate lighting or HVAC price menu. Scope and form families must be confirmed; field testing, acceptance testing, registry fees, CALGreen and AHJ fees are excluded.

Understand commercial TI report costs · Choose the commercial NRCC forms path

Mechanical / HVAC tenant improvement

  • Mechanical plans showing existing and proposed systems
  • Equipment schedule and available cut sheets
  • Zone areas served by the affected equipment
  • Notes distinguishing equipment replacement from a wider tenant remodel

Mechanical / HVAC TI: what to send

Educational intake checklist only, not an approval or compliance determination. The AHJ governs required documents and the applicable application date.

Optionally mark the items you already have. Selected items travel with the upload link as advisory context; you can change them on the quote form.

Accessible nameplate photos or installer cut sheets may help identify equipment. Do not open energized equipment to obtain a label.

Send what you have; missing items never block a quote request. We can ask for missing inputs before scope and price are confirmed. Documentation preparation is separate from field or acceptance testing.

Upload mechanical TI plans

Commercial documentation follows the published square-footage bands, not a separate lighting or HVAC price menu. Scope and form families must be confirmed; field testing, acceptance testing, registry fees, CALGreen and AHJ fees are excluded.

Understand commercial TI report costs · Choose the commercial NRCC forms path

Permit-desk sheets for your project file

Educational handoff notes, not a city submittal determination. Confirm requirements with your AHJ.

Upload plans for a scoped quote

Published schedule

Flat prices for report preparation

Residential

By conditioned floor area in the confirmed report scope.

Up to 2,000 sq ft
$149
2,001 to 4,000 sq ft
$199
4,001 to 6,000 sq ft
$279
Over 6,000 sq ft
$279 + $50per additional started 1,000 sq ft
Each additional dwelling unit
+$75beyond the first

Commercial

By floor area in the confirmed documentation scope.

Up to 5,000 sq ft
$399
5,001 to 15,000 sq ft
$599
Over 15,000 sq ft
Custom quote

Revisions

Plan-check correction caused by our modeling or report error
Free
Architectural or design revision after the report
$75 flat
Full remodel of the energy model or larger resubmittal
Custom quoteintake required

Rush

+$99 residential / +$149 commercial. Next-business-day production after complete inputs are received. Not a permit-approval or unconditional 24-hour promise.

Not included

  • ECC field verification (formerly called HERS testing in older documents)
  • Nonresidential acceptance testing
  • Registry or document registration fees
  • CALGreen documentation
  • Building department (AHJ) plan check and permit fees

No payment is taken online. Price and scope are confirmed with you before work begins. Full pricing page

Educational code context: California Energy Commission 2025 Energy Code resources. Confirm the applicable scope, recorded application date and requirements with the AHJ. This is not legal or engineering advice; CEC resources do not set our prices.

Common questions

Does your price include HERS or ECC testing?

No. ECC field verification, formerly called HERS testing in older documents, is performed separately by a qualified rater and is not included in our price.

Can I submit for my client?

Yes, if you have the plans and authority to share them. You sign in, upload the set and describe the scope. We confirm price and scope before any work starts.

What if the owner changes equipment mid-project?

Send the new specifications. A design change after the report is a flat published revision fee; a change large enough to rebuild the model is quoted after intake.

What starting report fee can I carry in my bid?

Residential report preparation starts at $149 for up to 2,000 conditioned sq ft; commercial starts at $399 for up to 5,000 sq ft. Use the published square-footage bands for larger scopes and add $75 per additional residential dwelling unit beyond the first. Upload the plans to confirm the report boundary; there is no separate ADU price menu.

Do your own plan-check errors cost the client extra?

City plan-check corrections caused by our modeling/report error are Free. Upload the comment letter, current report and coordinated plans so the correction can be distinguished from a changed design.

How should I allow for architectural revisions?

Architectural/design revisions after the report are $75 flat; full-model rebuilds and larger resubmittals require a custom quote after intake. ECC field verification, field testing, acceptance testing, registry fees, CALGreen and AHJ fees are separate, not included report offerings.

Next step

Send the plan set. We will scope it.

Sign in to upload. No payment is taken online, and submitting is not order acceptance. Report preparation is not field verification or acceptance testing.