City guide / Santa Cruz County
Title 24 planning in Santa Cruz
Preparation guidance for energy compliance documentation in Santa Cruz, California. Remote statewide service; local requirements come from your building department.
Hypothetical example / Santa Cruz
Two local topics: single-family work area and nonresidential cooling
ILLUSTRATIVE ONLY: compare two separate requests, not one combined permit. One owner alters a single-family home; an office applicant changes an existing nonresidential cooling system. The first team records addition/alteration areas and asks about the residential ordinance. The second identifies the affected mechanical scope and asks about the separate nonresidential cooling ordinance. Each needs its own application record, classification and documentation path. Neither team assumes that the other ordinance’s building category or threshold transfers to its project. The City determines actual applicability; the preparer coordinates supported inputs after that basis is established.
Illustrative scenario only; not a statement about local projects, climate or permit rules.
Scenario checklist
- Separate residential and nonresidential scopes
- Identify the relevant ordinance rather than one generic reach code
- Record application history, areas and affected systems
- Coordinate the appropriate form family and field handoffs
Santa Cruz: read the two CEC-listed ordinances separately
Project-preparation guidance, not a statement of local requirements. Confirm applicability with your project team and reviewing agency.
Residential: Ordinance 2025-19
The CEC’s 2025 approved-local-ordinances list, checked November 6, 2026, records approval of Santa Cruz Ordinance 2025-19 on January 21, 2026. Its topic is efficiency improvements for single-family additions and alterations greater than or equal to 350 square feet. This is an area-based single-family summary. It does not establish a multifamily threshold, a commercial requirement or a universal HVAC equipment rule. Ask the City how the actual residential scope and area definition are evaluated, including any exceptions and application treatment not reproduced in the CEC entry.
Nonresidential: Ordinance 2025-22
The same CEC list separately records approval of Ordinance 2025-22 on May 26, 2026. Its topic is a mechanical-cooling requirement for altered space-conditioning systems in existing nonresidential buildings, encouraging air-source heat pumps while allowing air conditioners with additional energy-efficiency measures. This is not the single-family cooling topic listed for some other cities. Keep the building category and affected systems explicit. The approval date is not automatically the City’s effective date, and the summary alone does not decide this permit’s equipment or measures.
Residential pathway: show the added and altered areas
For a house addition or remodel, supply dimensioned existing/proposed plans and separately labeled work areas. Do not substitute total dwelling size for the area of work or assume how multiple altered areas are combined. Ask the City which scope and area definition it needs for Ordinance 2025-19. Record the answer rather than allowing a preliminary model to silently decide the question.
Where the single-family documentation family applies, CF1R records proposed design compliance, with separate installer CF2R and required CF3R ECC verification. An ADU needs its own review of new detached construction, attached addition or conversion and existing conditioning. The residential ordinance summary does not itself classify every ADU or determine its documentation boundary.
Nonresidential pathway: identify the altered mechanical system
For existing office, shop or other nonresidential work, identify the affected space-conditioning equipment, areas served and responsible mechanical designer. State what changes and what remains. A lighting-only TI label is not enough if mechanical work is also proposed; conversely, do not assume that an untouched system must be remodeled merely because a tenant permit exists.
The applicable NRCC design documentation and construction-stage records depend on the confirmed scope and edition. Acceptance testing, applicable verification and installation certification are distinct tasks. A residential CF3R is not a universal substitute for nonresidential closeout records. Ask which participants and evidence are needed before equipment access or control sequences become a construction problem.
Commercial energy documentationNonresidential form familiesTenant-improvement checklist
Use the two scenarios to assign the right questions
In the illustrative house request, the architect prepares an area/scope sketch and asks about the residential local layer. The energy preparer then checks supported envelope and system inputs for the confirmed path. No pass/fail result or interpretation of the 350 sq ft topic is invented.
In the separate office request, the mechanical designer identifies the existing cooling and proposed alternatives. The applicant asks about Ordinance 2025-22 and required evidence for an air-source heat pump or an air-conditioner option with additional measures. The preparer evaluates supported documentation, not an assumed blanket ban on air conditioners. The single-family area topic is not imported into this office scenario.
Altered-cooling reach-code decision guideEnergy modeling and options
A two-category intake checklist
For both categories, make the application and changed work traceable. Add the appropriate category-specific records rather than sending only a product quote.
- Application basis: recorded date, permit identifiers, prior accepted package, classification and current City direction on the relevant ordinance.
- Residential scope: existing/proposed plans, dimensioned addition/alteration areas, dwelling boundaries and ADU/conversion history where applicable.
- Nonresidential scope: tenant/full-building boundary, affected systems, landlord equipment information, mechanical schedules and control narrative from the responsible designer.
- Common design evidence: assemblies, glazing U-factor/SHGC and system efficiencies where relevant; identify retained versus changed features and provisional selections.
- Revision evidence: complete numbered comments, reviewed drawings/report and a change summary naming the current coordinated set.
Confirm timing without inventing local deadlines
Statewide 2025 California Energy Code guidance generally follows applications on or after January 1, 2026. Ask the AHJ to confirm the recorded application date, treatment of later amendments/refiling and applicable local implementation. The two CEC approval dates are not universal filing deadlines. Use matching software/forms. ECC is current verification terminology; HERS can remain on older-cycle documents without changing their permit basis.
Remote scope review and published pricing
Title 24 Lab serves Santa Cruz remotely, not from a claimed local office. Review existing residential/commercial square-footage pricing and upload the appropriate scope packet. Field testing, acceptance testing, registry fees, CALGreen and AHJ permit fees are separate. Title 24 Part 6 energy documentation does not complete Part 11 CALGreen or other permit disciplines. Intake is not production acceptance or permit approval. This is educational information, not legal advice; the City decides applicability.
PricingGet a QuoteSanta Cruz County guideSan Jose guideSalinas guide
Checklist for Santa Cruz
- 01Identify which agency reviews permits for your Santa Cruz parcel (city, county or other).
- 02Confirm the building climate zone for the exact address using the CEC tool.
- 03Ask which Energy Code cycle applies to your application date.
- 04Ask whether local amendments or reach codes apply to your scope.
- 05Ask how energy forms should be included: on plan sheets, uploaded separately, or both.
County guide: another example
Hillside rebuild with limited site access
Read the Santa Cruz County guideQuestions
Are the two Santa Cruz ordinances the same scope?
No. The checked CEC list describes Ordinance 2025-19 for single-family addition/alteration area and Ordinance 2025-22 for altered cooling in existing nonresidential buildings. Keep those categories separate and confirm applicability with the City.
Does the nonresidential cooling summary require every home to use a heat pump?
No such conclusion follows. The listed 2025-22 topic is existing nonresidential space conditioning, not a universal residential mandate. The City must identify applicable requirements for the actual building and work.
Does the 350 sq ft topic apply to my office TI?
Do not transfer the listed single-family topic to an office. Define the nonresidential scope and ask the City about the applicable local and statewide requirements. This guide does not invent a commercial area threshold.
Is a commercial report the same as acceptance testing?
No. NRCC design documentation, installation certification, acceptance testing and applicable verification are separate responsibilities. The affected scope determines required records and participants; design preparation does not perform or certify those field tasks.
Do you have an office in Santa Cruz?
No. Service is remote and statewide; this page is a planning guide.
Where do I confirm Santa Cruz requirements?
With the building department that reviews your permit. Many incorporated cities run their own; confirm whether Santa Cruz or Santa Cruz County reviews your parcel.
How to use the official resources
Government links below are starting points for identifying the authority for the actual property and scope. They are not evidence of an affiliation, an office or approval of this service. Start at Santa Cruz’s city site for city department navigation; the county link provides separate county context.
The CEC climate tool supports a location-specific lookup; this guide assigns no climate zone. The CEC Energy Code Support Center separates edition-specific forms and building categories. Confirm the applicable edition, document family and any registration or verification requirements before using a form.
CEC Energy Code Support Center: forms, FAQs and trainingNext step
Preparing a project in Santa Cruz?
Published flat pricing from $149 residential and $399 commercial. Upload plans privately; no payment is taken online.